2010 Engineering Project Update
Week of July 12th-16th, 2010
PROJECT NO. HDP-CO64(99)--6B-64
Location: Highland Acres Rd. from 233rd St. North to Lincoln Way.
Contractor: Cessford Construction Inc. from Le Grand, IA.
Construction Activity: Construction on new grade of roadway began on May 14, 2009, and was completed in the fall of 2009. The road has been paved with 4 inches of new asphalt. Shouldering and painting are finished, the county crews will be picking up a few of the extra piles of rock around the site in the next week.
Duration: Project is completed and the road is open for traffic.
PROJECT NO. STP-S-C064(110)—5E-64
Location: 3.5 miles of 330th Street (E67) East of Laurel from Highway 14 to Underwood Ave.
Contractor: Cessford Construction Le Grand
Construction Activity: Road will receive Cold In Place Recycling (C.I.P.R.) where the existing roadway is ground up and then re-laid with fresh oil followed up by a 2 inch new asphalt overlay.
Duration: The project should take around four weeks to complete.
PROJECT NO. BRS-C064(106)--60-64
Location: Iowa river bridge on Marble Road approximately 3/4 mile West of Knapp Ave. or 1.5 miles West of Liscomb.
Contractor: Godberson Smith of Ida Grove, Iowa
Construction Activity: Contractor has moved in and has begun removing existing bridge. The road will be closed to traffic thoughout the contruction.
Duration: The project should take around four months to complete.
PROJECT NO. FM-TSF-C064(112)—5B-64
Location: 2 miles of East Main Street Road (E35) East of Marshalltown from city limits to Three Bridges Road on Wallace Ave.
Contractor: Project has not been let for bidding.
Construction Activity: Road will receive a 2” asphalt overlay, newly designed rumble strips and updated signs.
Duration: Marshall County has a projected start date of September or October and should take around four weeks to complete.
GRANULAR RESURFACING
DIVISION 1
Location: Covers the Northeast ¼ of the county from Knapp Ave. East and from East Main Street Road North.
Contractor: Cessford Construction Inc. from Le Grand, IA.
Construction Activity: Gravel roads receive new rock.
Duration: Project is complete.
DIVISION 2 & 4
Location: Covers the Southern ½ of the county from Highway 30 South.
Contractor: Martin Marietta, rock will come from their Ferguson quarry.
Construction Activity: Gravel roads receive new rock.
Duration: Divisions two and four are completed.
DIVISION 3
Location: Covers the Northwest ¼ of the county from Knapp Ave. West and from Highway 30 North.
Contractor: Knife River Corporation, rock will come from their quarry located north of St. Anthony on S57
Construction Activity: Gravel roads receive new rock.
Duration: Project is completed.